Several months ago, KTWR started the process of getting a solar power system installed at the station. It took us quite a while to get the 30KW system designed. Now that the parts have been packed for shipment, we are getting more excited about having this operating at KTWR. As you can imagine, our power bills are a large chunk of our yearly budget. Having a 30KW grid-tie system will save money that can be used to expand TWR's ministry to the Asia/Pacific Region. We expect the system to be operational in July. If this system works as expected, we intend to add more power generation capacity. We are allowed up to 100KW for a grid-tie alternative energy capability. There will be times of the day during which the power meter will run backwards. That will be fun to watch!Search This Blog
Monday, May 19, 2014
Solar Power Coming to KTWR
Several months ago, KTWR started the process of getting a solar power system installed at the station. It took us quite a while to get the 30KW system designed. Now that the parts have been packed for shipment, we are getting more excited about having this operating at KTWR. As you can imagine, our power bills are a large chunk of our yearly budget. Having a 30KW grid-tie system will save money that can be used to expand TWR's ministry to the Asia/Pacific Region. We expect the system to be operational in July. If this system works as expected, we intend to add more power generation capacity. We are allowed up to 100KW for a grid-tie alternative energy capability. There will be times of the day during which the power meter will run backwards. That will be fun to watch!Thursday, May 15, 2014
Heavy Metal
Friday, April 18, 2014
Regular Japanese DRM Broadcast

After years of working on getting ready for DRM, it has not quite sunken in that we are now doing regular DRM broadcasts to Japan. These Sunday broadcasts at 12120KHz at 1057-1156UTC are being eagerly received across the country. Many listeners use software defined radios (SDRs) to tune us in. These radios are hardware combined with software running on a PC or a laptop. Many listeners have sent us proof of reception with screenshots similar to the one shown above. The narrow peaks are normal analog broadcasts. The wide "Bart-head" is the DRM signal from KTWR. Not only does that signal carry audio, but it also has text info such as the station ID and a short message that scrolls across the receiver display.
Most of the early listeners to this broadcast have been shortwave radio enthusiasts. Japan seems to have more SW hobbyists per capita than any other country on the planet. They were actually the ones who encouraged us to start these broadcasts. Most hobbyists will tune in a broadcast they have not heard before once or twice for short times to get a QSL card or other souvenir from the station. However, we have been greatly encouraged by the fact that these listeners listen to the entire program. They tell us how much they enjoyed hearing the programs for their content, not just the signal quality.
We do pray that this experiment expands to more days and more countries in the near future. This technology allows people to clearly hear the gospel while using 1/3 the power of analog broadcasts. The power savings allows us to expand the ministry to more people groups.
ANT2A is Up
Now that this work is complete, we can consentrate on building the antenna switch matrix. The control software work has progressed very well.
Tuesday, April 15, 2014
Major Detour
For the past several weeks, we had been working hard on the antenna switch matrix. It would have been really helpful if we had that already in operation. We were hoping to have part of the matrix operational in early May, so that we could increase the power for a TX7 broadcast.
Last week, ANT2A had one of its cable swage clamps fail. This caused one end to fall to the ground. This sort of thing tends to break many insulators and cables. We had to use jumpers to connect TX7 to ANT3 and reconnect TX2 to ANT2B. This allowed us to continue our normal broadcast schedule. Without the matrix, we also had to do our Japanese DRM broadcast on TX6 and ANT1 instead of TX7 and ANT2A.

The antenna has been reassembled and is now back up in the air. We are still working on repairing the slew switch and its input transformer. The slew switch is what controls the direction that the radio waves go when they leave the antenna on their way to the listeners. The transformer is the set of wires needed to adapt the signal from the transmitter to the antenna system.
Once repairs are complete, we can resume work on the matrix hardware. In the meantime, we do have a short-term visitor who is working on the control software. We should have a usable software system by the end of the week.
Last week, ANT2A had one of its cable swage clamps fail. This caused one end to fall to the ground. This sort of thing tends to break many insulators and cables. We had to use jumpers to connect TX7 to ANT3 and reconnect TX2 to ANT2B. This allowed us to continue our normal broadcast schedule. Without the matrix, we also had to do our Japanese DRM broadcast on TX6 and ANT1 instead of TX7 and ANT2A.

Thursday, March 27, 2014
Progress
There have been various points of work these last couple weeks.
1) Fabrication and placement of Matrix complex. The 'feed line beam' (or hanger) has been constructed. This is a massive 40 foot beam that Jim has welded together. This will be the beam where the feed lines from the building will come to and then be distributed to the matrix.
2) The PLC has been fabricated and tested with an antenna switcher. The micro switches and relays have been added. It was great to see a switching test - it took only 8 seconds for the switch to change from A to B. The seven switchers have been fit and are now on the pad. There are three more switchers that will need the frames fabricated and then readied for the matrix.
And on March 30, 2014 as the new season begins KTWR will be broadcasting it's first DRM broadcast - in Japanese.
1) Fabrication and placement of Matrix complex. The 'feed line beam' (or hanger) has been constructed. This is a massive 40 foot beam that Jim has welded together. This will be the beam where the feed lines from the building will come to and then be distributed to the matrix.
2) The PLC has been fabricated and tested with an antenna switcher. The micro switches and relays have been added. It was great to see a switching test - it took only 8 seconds for the switch to change from A to B. The seven switchers have been fit and are now on the pad. There are three more switchers that will need the frames fabricated and then readied for the matrix.
3) In preparation for the coming frequency period antenna two has to be fitted for transmitter seven. This is pre-switcher matrix broadcasting. Because of the amount of programming we are putting on TX 7 we need to use antenna two and the old A/B switch. By the end of April the antenna matrix first stage will take the place of the A/B switch and switching between antenna two and three.
Thursday, March 6, 2014
Moving Right Along...
It's great to be able to show things coming together.
Paul has completed substantial work on the retaining wall of the pad.
Paul has completed substantial work on the retaining wall of the pad.
The switch control box has been connected and we've been able to test the switch and establish a switching time. (There are still a couple microswitches to be installed and wiring to be completed.)
Four of the mounted switchers have been moved to the pad. Now we can show a good picture of the matrix coming together.
Stay tuned...