The second part of installing the cooling system is the chiller units outside.
From preparation:
to moving:
to mounting the units.
Next is the process of ..... wiring.
Search This Blog
Monday, November 19, 2012
Cooling System - Part 1
The first part of the cooling system work on the transmitter was to install the blowers.
This began with building/welding the frames and them mounting them to the transmitter.
Finally mounting the blowers. These units weigh around 300lbs. each.
This began with building/welding the frames and them mounting them to the transmitter.
Wednesday, November 14, 2012
Tube Socket
Much of the recent work on TX 7 has been to the tube socket and related parts. As mentioned in the previous blog, some ceramic insulators had to be replaced. We were able to fabricate them right here.
The air nozzle below the tube socket had to be replaced as well. This was also fabricated right here.
With all the parts refurbished and replaced, the tube socket was completed and put together.
And finally... the installation of the power tube!