Over the past couple of weeks, a new wall has been emerging between the transmitter room and the "Shop" (where all the building and welding occurs, and where the shop tools are kept). Because of the immense size and irregular angles, many of the pieces of sheet rock had to be cut into unusual sizes and angles. It was like putting a puzzle together but your having to make your own pieces as you went along. As the wall went up, right behind the builders, were the electricians to put electrical lines into conduit pipes to put in new receptacles; shop lights were put up as well.
Meanwhile, now that the new transmitters are sitting firmly in place, it's time to get everything figured out, wired up, and tested. Which is much easier to say than to actually do! It is a long and thoughtful process, and one might even add, this too is a puzzling situation at times. Right now there are a bunch of wires coming from TX 6 and each one must be checked to see where they go and what they do. Currently they are looking for the source of 240 volts for a line that is needed. The cooling system is also getting a check-up which will involve filling the tank with water then checking for leaks and finally checking the pump.
There is excitement in the air over the potential of several new staff both short and long term. God seems to be answering prayers.
No comments:
Post a Comment